09:00- 10:00 | Registration |
10:00- 10:15 | Welcome Address by the Conference Chairman |
10:15- 11:15 | Plenary session I
(Conference
Room)
“Assignment Problems: the first 50 years”, S.Martello
Chair M. Despontin |
11:15- 11:30 | Coffee break |
11:30- 13:00 |
T1A: OR in sheet metalworking
(Conference Room)
Chair D.Cattrysse
| | T1A-1 | Sequencing and scheduling in the sheet metal shop, K.Sörensen et al. |
| T1A-2 | Production planning for the sheet metal shop with multiple machines, B.Verlinden et al. |
| T1A-3 | Neighbourhood search for sheet-metal shop production planning: multiple laser cutting and air bending machines, H.Crauwels et al. |
T1B: Mathematical Programming I
(Symposium Room)
Chair D. Van den Poel
|
| T1B-1 | A Branch-and-Refine Method for Mixed Integer Nonlinear and Nonconvex Global Optimization Problems, S.Leyffer et al. |
| T1B-2 | Sample aspects of Kriging global optimization, W.Jacquet |
| T1B-3 | Teaching OR and Solving Business Problems with AIMMS, F.de Rooij |
|
13:00- 14:00 | Standing Lunch / ORBEL Board Meeting |
14:00- 15:30 |
T2A: Production and multi agent systems
(Conference Room)
Chair P.De Causmaecker
| | T2A-1 | A decision model for line feeding, V.Limère et al. |
| T2A-2 | Global Constraints for the Mean Absolute Deviation and the Variance: Application to the Vertical Line Balancing, P.Schaus et al. |
| T2A-3 | Distributed breakout algorithm for the distributed propositional satisfiability problem, T.Messelis et al. |
T2B: Graph Theory
(Symposium Room)
Chair R. Bisdorff
|
| T2B-1 | The K-Edge 3-Hop Constrained Network Design Polyhedron, Q.Botton et al. |
| T2B-2 | Transforming Hop-limited Node-disjoint paths into numbers, V.Ho |
| T2B-3 | Tight Parameterized Approximation Ratios for the Connected Vertex Cover Problem, J.Cardinal et al. |
|
15:30- 16:00 | Coffee break |
16:00- 17:30 |
T3A: Transport and Distribution
(Symposium Room)
Chair K.Ramaekers
|
| T3A-1 | A Local Search Heuristic for Road Haulage in Intermodal Freight Transport, A.Caris et al. |
| T3A-2 | Traffic assignment based on activity travel data: a case study, K.Ramaekers et al. |
| T3A-3 | Robust cyclic distribution planning, Birger Raa |
T3B: Stochastic Problems
(Symposium Room)
Chair El-Houssaine Aghezzaf
|
| T3B-1 | A Coupling Plan for a Two-Stage Lot Sizing Problem with Stochastic Demands, C.Sitompul et al. |
| T3B-2 | Extinction probability of branching processes with catastrophes, S.Hautphenne et al. |
| T3B-3 | Generating a multivariate random sample, using a pdf model based on a piecewise multilinear approximation, E.Nyssen et al. |
T3C: Medical Applications
(Studio2)
Chair G.Vanden Berghe
|
| T3C-1 | Applying a local search algorithm to automatically assign patients to beds, P.Demeester et al. |
| T3C-2 | Constrained Decompositions of Integer Matrices and their Applications to Intensity Modulated Radiation Therapy, C.Engelbeen et al. |
| T3C-3 | The Problem Description and a Solution Method for the Nurse Rostering Problem in Belgian Hospitals, B.Bilgin et al. |
|